Services

Erosion and Sediment Control Plans (ESCPs)
All projects that require a grading permit (regardless of acreage) should implement Best Management Practices (BMPs) to minimize erosion and sedimentation.  The ESCP will lay out a strategy to retain sediment onsite using an effective combination of erosion and sediment controls.

SWPPP Preparation/ Development
Construction projects over one acre are required the develop and implement a Stormwater Pollution Prevention Plan (SWPPP).  The SWPPPs two major objectives are: (1) to help identify the sources of sediment and other pollutants that affect the quality of stormwater discharges; and (2) to describe and ensure the implementation of BMPs to reduce or eliminate sediment and other pollutants in stormwater and non-stormwater discharges.  The SWPPP can only be written, amended and certified by a Qualified SWPPP Developer (QSD).  As of September 2011, the QSD shall have attended an approved 24-hour training class and passed a state-sponsored exam.

Risk Level Assessment
Notice of Intent (NOI)
Site Inspections
Weather Monitoring
Rain Event Action Plan (REAP)
Spill Prevention Plan
Discharge Sampling and Analysis
Hydrology/ Basin Sizing
Annual Reporting
Notice of Termination (NOT)
Storm Water Multiple Application and Report Tracking System (SMARTS)